Building regulations inspections
The Building Regulations set out requirements for specific aspects of building design and construction. Building regulations approvals can be sought either from the building control department of the local authority or from an approved inspector. The approval may involve desk studies to verify submitted information and / or inspections.
Very small projects and changes to an existing buildings can obtain building regulations approval purely by inspection. Larger, new-build projects, will generally require a 'full plans' application, meaning that full details of the proposed building works are submitted for approval before the works are carried out, and then inspections are carried out to ensure that the works have been undertaken in accordance with the approved information.
The number and frequency of inspections will depend on the nature of the works being undertaken. Typically they will take place at key stages such as:
- Commencement.
- Excavation, (before excavations are filled).
- Foundations (before they are covered up).
- Laying of damp proof courses.
- Installation of new drains (before covering up).
- Construction of the primary structure.
- Installation of insulation.
- Roof construction.
- Completion.
Advance notice of the progress of the works must be given to the relevant building control body so that they are able to schedule inspections at the appropriate times. If the appropriate inspections have not been carried out, a completion certificate may not be issued, and it may be necessary to open up parts of the works so that inspections can be carried out.
NB: Competent person self-certifications schemes (or competent person schemes) introduced in 2002 allow registered installers (mostly small firms or sole traders) who are competent in their field to self-certify certain types of building work. See Competent person self-certifications schemes for more information.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.